05Subscribe
Equipment & IoT
subscription (HaaS)
New or replacement equipment. No need to buy or own.
Upfront ¥0
Full-Flat plan*
* Equipment is quoted individually. The Full-Flat plan has a minimum contract term.

Equipment on subscription.
Plus IoT, installation
and maintenance.
Alongside IoT, we can propose refrigeration, cold storage and HVAC equipment under the Full-Flat plan with ¥0 upfront, quoted individually. Greenphard handles equipment ownership, maintenance and subsidy applications within the agreed contractual scope.
Equipment [By quote]
Refrigeration, cold storage and HVAC equipment. Latest models supporting new refrigerants such as CO₂. Peripheral and ancillary equipment is also covered.
IoT & control [Standard]
Greenphard IoT DR Solution. Automated energy-saving control and visualisation (DR provided under a separate contract).
All in one monthly fee
Installation & replacement + Maintenance (within contract scope) + Subsidy applications
Upfront ¥0
* Equipment is quoted individually. The Full-Flat plan has a minimum contract term.
How payments work
With conventional purchase, upfront spending comes first and payback takes years. With the Full-Flat plan, refrigeration equipment and IoT are provided for a monthly fee, with ¥0 upfront.
Conventional purchase (large upfront cost)
Full-Flat plan
Equipment and IoT monthly, ¥0 upfront
Illustrative relationship between value and cost
- Spend: equipment purchase & installation
- Spend: maintenance, repairs / monthly fee
- Value: energy saving + DR + optimised procurement
Less ownership.
Less administration.
- Owning refrigeration and HVAC equipment and managing it as assets
- Maintenance and repairs within the contractual scope
- Support for replacement planning and implementation procedures
- Subsidy application documents and completion reports
Payment options
2 × 2 × 2 = 8
View Function Grades & Plans- Subscription type
- With upfront cost
- Full-Flat (¥0 upfront)
- Demand Response
- With DR-revenue discount
- Without discount
- Subsidy
- With subsidy
- Without subsidy
Upfront, monthly and option costs are quoted individually.
* Equipment is quoted individually. The Full-Flat plan has a minimum contract term. Subsidy requirements vary by programme and year; approval is not guaranteed.
* The Full-Flat plan has a minimum contract term set according to equipment statutory useful life, subsidy programmes, DR contracts and other factors. Early termination requires payment of the remaining term’s total monthly fees plus removal and restoration costs. Fees are billed annually in advance, starting in the month after construction begins. If prices, interest rates, electricity regulations, DR performance, subsidy amounts or other factors differ significantly from assumptions at contract signing, fees may be reviewed about once a year. Any single increase is capped at 20% of the monthly fee.
* Subsidy requirements vary by programme and year, and approval is not guaranteed. Subsidies received are used to reduce service fees.
* Refrigeration, cold storage, HVAC and peripheral equipment are discussed and quoted individually by configuration and quantity. IoT control is standard; DR requires a separate contract. The value of energy saving, DR and procurement optimisation is estimated on a best-effort basis and varies with equipment and operation. DR payments may be built into monthly fees or settled separately, depending on the plan. Confirm accounting treatment with your auditors.
* The chart illustrates payment timing, not a comparison of totals. Amounts and ratios vary with equipment and operation. Energy saving, DR and procurement optimisation draw on the same equipment flexibility, so their effects cannot simply be added together. DR requires a separate contract.